Urgent? Get matched

Hot water installation on the Sunshine Coast Plan it before it's plumbed.

An installation is a bigger job than a swap: a new home, an extension, a unit that has to move, or a change to solar or a heat pump. The location, pipes, power or gas and paperwork all need planning. We'll match you with a licence-checked Sunshine Coast plumber who specialises in hot water installation.

A copper pipe and a soldered tee joint

Planning an install on the Sunshine Coast

Room around most homes

Separate houses made up 73.1% of occupied homes in the Sunshine Coast council area at the 2021 Census, and flats or apartments 12.8%. Most installs are on house blocks. In an apartment, check with the body corporate before a unit is added or moved.

June is the solar test

Sunshine Coast Airport averages 24.1 MJ per square metre of sun a day in January but 12.0 in June. Ask how a solar system performs in June, not just in summer.

Morning air for a heat pump

The same station's July mean minimum is 9.7°C, and its humidity at 9am averages 71%. A heat pump works from that air, so ask the installer about siting and run times.

Know where the pipes run

Sunshine Coast Council can supply plumbing records and drainage plans for a property through a building, plumbing and development search. They help when a system is moving to a new spot.

New home or existing home?

New homes. For a new dwelling, Queensland counts the energy performance of the hot water system in the National Construction Code's Whole of Home energy budget. Your builder, designer and plumber should agree on the system early, because it counts towards that energy budget.

Existing homes. Installing, replacing or removing a water heater in an existing building is notifiable work, and so is fitting or replacing a temperature control device. The licensee registers it with the QBCC within 10 business days of the invoice, and you should get a copy.

How an installation usually runs

  1. Site visit

    The plumber looks at where the unit can go, the water and drain connections, and the power or gas supply.

  2. Choosing the system

    Size, type and position are agreed. For solar or a heat pump, confirm the installer holds the QBCC's solar and heat pump endorsement.

  3. Installation

    A temperature control device is fitted, because Queensland requires one on all new and replacement systems, and the tank is set to heat water to at least 60°C.

  4. Paperwork

    Notifiable work is registered with the QBCC. If gas is connected, the gas fitter issues a gas system compliance certificate on completion.

Moving an existing system

Shifting a unit means new pipe runs and connections, and an electric or heat pump unit may need an electrician as well. Gas units need a licensed gas fitter, who must check the supply can handle the appliance in its new spot.

Ask the plumber who arranges each trade, and who registers the work. Our national hot water installation page covers placement in more detail.

Questions for the installer

  • Where will the unit go, and why there?
  • Are you QBCC-endorsed for solar and heat pump work?
  • Which temperature control device are you fitting?
  • Who registers the notifiable work, and when will I receive the copy?
  • Is the STC discount shown on the quote, and is the model on the register?

What we would do

Decide on the system before the slab or the frame goes in, not after, so the pipes and power are run once. For solar, think about the June sun as well as the January sun, and for a heat pump, about the cool, damp winter mornings and where the noise will carry. Ask for the QBCC endorsement number in writing and check it. Then make sure the quote shows the temperature control device, the STC discount and who lodges the paperwork. A plumber who specialises in hot water installation will have answers ready.

Questions people ask

Can any plumber install solar hot water on the Sunshine Coast?

No. Queensland requires solar and heat pump systems to be installed by a hot water installer who holds the QBCC's solar and heat pump endorsement.

Does a new hot water system in my existing house need to be registered?

Yes. Installing a water heater in an existing building is notifiable work, so the licensee registers it with the QBCC and sends you a copy within 20 business days of registering it.

We're building new. Can we choose any hot water type?

Queensland's guidance ties it to the house design: a new dwelling's hot water counts in the Whole of Home energy budget under the National Construction Code. Settle the type with your builder and plumber before plans are final.

Tell us the problem. We'll find the specialist.

We match your job with a local plumber who specialises in hot water, licence checked.

Find a hot water specialist Urgent? Start here

Urgent?Get matched